| | CPCCBC5009 Identify services layout and connection methods for Type B and C constructions |
| | CPCWHS1001 Prepare to work safely in the construction industry |
| | CPCCBC4053 Apply building codes and standards to the construction process for Class 2 to 9 Type C buildings |
| | CPCCPB3027 Install ceiling insulation products |
| | CPCCPB3014 Install bulk insulation and pliable membrane products |
| | CPCCBC5019 Manage building and construction business finances |
| | CPCCBC5013 Manage professional technical and legal reports on building and construction projects |
| | CPCCBC5004 Supervise and apply quality standards to the selection of building and construction materials |
| | CPCSUS4002 Use building science principles to construct energy efficient buildings |
| | CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry |
| | CPCPCM3024 Prepare simple drawings |
| | CPCCCO2022 Select, check and maintain concreting plant, tools and equipment |
| | CPCPWT3027 Install backflow prevention devices |
| | CPCCCO2021 Handle concreting materials |
| | CPCPGS4022 Service Type A gas appliances |
| | CPCCBS6102 Research and evaluate construction methods and materials for Class 2 to 9 buildings to three |
| | storeys |
| | CPCCON3048 Construct tilt panels on site |
| | CPCCCM1013 Plan and organise work |
| | CPCCCA3014 Construct and install bulkheads |
| | CPCCBS6116 Assess and advise on performance solutions for Class 2 to 9 buildings to three storeys |
| | CPCCCM1014 Conduct workplace communication |
| | CPCCCM1015 Carry out measurements and calculations |
| | CPCCCA2003 Erect and dismantle formwork for footings and slabs on ground |
| | CPCCCM2001 Read and interpret plans and specifications |
| | CPCCCO3053 Slump test concrete |
| | CPCCCM1012 Work effectively and sustainably in the construction industry |
| | CPC08 - Construction, Plumbing and Services Training Package |
| | CPCPWT4011B Design and size heated and cold water services and systems |
| | CPCCBC4013A Prepare and evaluate tender documentation |
| | CPCCCO3036A Plan concrete work and brief team |
| | CPCPDR4013B Design and size domestic treatment plant disposal systems |
| | CPCCBC5010B Manage construction work |
| | CPCCCM1016A Identify requirements for safe tilt-up work |
| | CPCPGS4011C Design and size consumer gas installations |
| | CPCPRF4011B Design and size roof drainage systems |
| | CPCCSP3001A Apply float and render to straight and curved surfaces |
| | CPCPSN4011B Design and size sanitary plumbing systems |
| | CPCPDR4012B Design and size stormwater drainage systems |
| | CPCCCA3002A Carry out setting out |
| | LRES Training Management Pty Ltd | Page 20 of 42 |