CPCCBC4005A Produce labour and material schedules for ordering – LRES Training Management

CPCCBC4005A Produce labour and material schedules for ordering

$695.00

Learner Guide with Unit Content, Assessment Tasks, Competency Records, Benchmark Answers and Assessment Mapping for CPCCBC4005A Produce labour and material schedules for ordering.

Description

Learner Guide with Unit Content, Assessment Tasks, Competency Records, Benchmark Answers and Assessment Mapping for CPCCBC4005A Produce labour and material schedules for ordering.

This unit of competency specifies the outcomes required to produce schedules of resource requirements so that orders can be placed for materials and labour for residential and commercial projects and to record and track costs as they are incurred. Knowledge of codes, regulations and approval processes, contractor systems, physical resource and supplier identification and the ability to assess the availability of and requirements for skilled labour are essential.

FORMAT: Customisable MS Word

Qualifications that include this unit

  • MSF40413 – Certificate IV in Glass and Glazing
  • FWP40416 – Certificate IV in Timber Truss and Frame Design
  • FWP40316 – Certificate IV in Timber Truss and Frame Manufacture
  • FPI40411 – Certificate IV in Timber Truss and Frame Design
  • FPI40410 – Certificate IV in Timber Truss and Frame Design
  • FPI40311 – Certificate IV in Timber Truss and Frame Manufacture
  • FPI40310 – Certificate IV in Timber Truss and Frame Manufacture
  • CPC50210 – Diploma of Building and Construction (Building)
  • CPC40808 – Certificate IV in Swimming Pool and Spa Building
  • CPC40708 – Certificate IV in Building and Construction (Trade Contracting)
  • CPC40508 – Certificate IV in Building and Construction (Site Management)
  • CPC40308 – Certificate IV in Building and Construction (Estimating)
  • CPC40208 – Certificate IV in Building and Construction (Contract Administration)
  • CPC40110 – Certificate IV in Building and Construction (Building)
CPCCBC4005A Produce labour and material schedules for ordering